← All documents

Construction Phase Plan · from £59

CDM 2015 regulation 12, sized to your project

Every construction project needs one — even domestic jobs. Proportionate, structured and ready for your client or building control, without gold-plating a small job.

What lands in your inbox

Sample pages from a real CPP — professionally formatted Word document, yours to edit, minutes after you order.

Construction Phase Plan
CDM 2015 regulation 12 · single-storey rear extension
1 · Project and duty holders
ClientMr & Mrs Example
Principal ContractorYour Company Ltd
Programme8 weeks from 4 August 2026
3 · Site rules
• Site secured with Heras fencing; gates locked outside working hours
• No operative works alone on excavations or at height
5 · Key risks and controls
RiskControl
Open excavationsBarriers and stop blocks, daily inspection, ladder access…
Occupants adjacentSegregated access route, no plant movement during school run…
7 · F10 notification

Every CPP includes

  • Project description, programme and duty holders table
  • Management arrangements — supervision, inductions, RAMS checking, RIDDOR
  • Practical site rules proportionate to the job
  • Site set-up and welfare against Schedule 2
  • Key site-wide risks and controls register
  • Emergency arrangements — fire, first aid, escape, service strikes
  • F10 notification assessment

The more you give us, the more you get back

The basics take five minutes. Every extra you add turns into real content in the document.

You add: Client and Principal Designer names
A completed duty-holders table — the first thing a reviewer checks
You add: Start date, programme and welfare details
Site set-up and welfare sections that match what's actually on the ground
You add: Plans and drawings
A referenced document register, stored with your order

Paperwork every week? Meet your dashboard

Subscribers from £29/month get unlimited documents, a document library, and a saved company profile — logo, details and operatives' cards applied to every document automatically.

Your dashboardTrade plan · £29/mo
DocumentJobDownload
RAMS + COSHH
BD-8F2K1A
Full rewire — Leeds LS1RAMS.docx · COSHH.docx
Toolbox talk
RD-SK92XQ4
Working at height refresherTalk.docx
Company profile — Kiff Electrical Ltd · logo saved · 2 operatives with cards on file✓ applied to every document
Compare subscription plans

Ready? Choose your service

Both options use the same questions — pick how much assurance you want.

Instant CPP

£59

Generated from your answers and in your inbox within minutes. You review and approve before use. Perfect when the main contractor wanted it yesterday.

Start instant order →

Not this document? RAMS · COSHH · Toolbox Talk · O&M Manual