A RAMS that gets you on site — not sent back
Fifteen sections, a fully scored 5×5 risk assessment and a step-by-step method statement, written for your actual job — not a template with the blanks filled in.
What lands in your inbox
Sample pages from a real RAMS — professionally formatted Word document, yours to edit, minutes after you order.
| Activity | Full rewire of 3-bed semi, new consumer unit |
| Site | 12 Example Road, Leeds — occupied domestic |
| Operatives | 2 operatives · 5 days · 08:00–16:30 |
| Hazard | Initial | Control measures | Residual |
|---|---|---|---|
| Live electrical services | 4×5=20 | Safe isolation to GS38, lock-off kit, prove dead at point of work… | 1×5=5 |
| Working at height | 3×4=12 | Podium steps only, no ladders for prolonged work, 3 points of contact… | 1×4=4 |
| Dust & debris | 3×3=9 | On-tool extraction, FFP3 masks when chasing, sheeting to occupied rooms… | 1×3=3 |
| Name | Signature ……………… Date ……… |
| Signature ……………… Date ……… |
| Site-Plan-Rev02.pdf | Supplied with order |
| Elevation-North.pdf | Supplied with order |
Every RAMS includes
- ✓ Scope of works and general site information
- ✓ Materials, plant and equipment register
- ✓ Training and competence requirements
- ✓ Site arrangements (access, welfare, segregation)
- ✓ Numbered sequence of works — the method statement
- ✓ 5×5 scored risk assessment with control measures and residual scores
- ✓ Occupational health and COSHH considerations
- ✓ Permits, PPE and emergency arrangements
- ✓ Environmental considerations and assumptions register
- ✓ Amendments record, sign-off box and operatives' acknowledgement sheet
The more you give us, the more you get back
The basics take five minutes. Every extra you add turns into real content in the document.
Paperwork every week? Meet your dashboard
Subscribers from £29/month get unlimited documents, a document library, and a saved company profile — logo, details and operatives' cards applied to every document automatically.
BD-8F2K1AFull rewire — Leeds LS1RAMS.docx · COSHH.docx
RD-SK92XQ4Working at height refresherTalk.docx
Ready? Choose your service
Both options use the same questions — pick how much assurance you want.
Instant RAMS
Generated from your answers and in your inbox within minutes. You review and approve before use. Perfect when the main contractor wanted it yesterday.
Start instant order →Professionally reviewed
The same draft checked, corrected and signed off by a qualified H&S professional within 24 working hours. For bigger jobs and fussier principal contractors.
Start reviewed order →Not this document? COSHH · Toolbox Talk · CPP · O&M Manual