Substance-by-substance COSHH, done properly
A structured assessment under the COSHH Regulations 2002 — exposure routes, workplace controls, storage, spillage and first aid for every substance on your job.
What lands in your inbox
Sample pages from a real COSHH — professionally formatted Word document, yours to edit, minutes after you order.
| Substance | Hazard | Controls | RPE/PPE |
|---|---|---|---|
| Solvent cement | Flammable, irritant vapour | Ventilate work area, no ignition sources, minimum quantities… | Nitrile gloves, goggles |
| Silica dust (chasing) | Carcinogen — WEL 0.1 mg/m³ | On-tool extraction (M-class), wet cutting where possible… | FFP3 face fit tested |
| Skin contact | Remove contaminated clothing, wash with soap and water… |
| Eye contact | Irrigate 10 minutes with eyewash, seek medical advice… |
Every COSHH includes
- ✓ Activity and substances in scope — including typical trade products
- ✓ Substance assessment table: hazard class, exposure route, persons at risk, controls, RPE/PPE
- ✓ Workplace exposure limit references (EH40) where relevant
- ✓ Storage and transport requirements
- ✓ Spillage response and disposal routes
- ✓ First aid measures per exposure route
- ✓ Health surveillance requirements
- ✓ Assumptions register and sign-off
The more you give us, the more you get back
The basics take five minutes. Every extra you add turns into real content in the document.
Paperwork every week? Meet your dashboard
Subscribers from £29/month get unlimited documents, a document library, and a saved company profile — logo, details and operatives' cards applied to every document automatically.
BD-8F2K1AFull rewire — Leeds LS1RAMS.docx · COSHH.docx
RD-SK92XQ4Working at height refresherTalk.docx
Ready? Choose your service
Both options use the same questions — pick how much assurance you want.
Instant COSHH
Generated from your answers and in your inbox within minutes. You review and approve before use. Perfect when the main contractor wanted it yesterday.
Start instant order →Professionally reviewed
The same draft checked, corrected and signed off by a qualified H&S professional within 24 working hours. For bigger jobs and fussier principal contractors.
Start reviewed order →Not this document? RAMS · Toolbox Talk · CPP · O&M Manual